Boeing handed over the seventh production P-8A Poseidon to the U.S. Navy on schedule March 29, marking the first delivery from the second low-rate initial production contract awarded in November 2011.
Showing posts with label Poseidon. Show all posts
Showing posts with label Poseidon. Show all posts
Wednesday, 3 April 2013
Tuesday, 5 February 2013
Boeing delivers 6th production P-8A Poseidon maritime patrol aircraft to U.S. Navy.
Boeing delivered the sixth production P-8A Poseidon aircraft to the U.S. Navy Jan. 31, successfully completing the first group of low-rate initial production aircraft that are dramatically improving the service's maritime patrol capabilities.
Subscribe to:
Posts (Atom)